|
|
|
|
||||||||||||||||||||||
Project Description
This project consisted of the installation of all civil work associated with a Howe-Baker designed Box Reformer Hydrogen Unit for Air Liquide in the Chevron Refinery of El Segundo, California. Teton's scope of work incorporated all concrete placement along with the underground piping for the Cooling Water, Oily Water Sewer and Sanitary Sewer systems, and the installation of all underground electrical ductbanks, conduits, and grounding system.
|
Contact
For similar projects contact:OwnerAir Liquide America
Engineer |
| Site Design and Build by Impello Inc. | Copyright © 2005 PCL Constructors Inc. All rights reserved. |
| Our operations are carried out by a number of independent companies which operate in different construction markets and geographic areas. |