|
|
|
|
||||||||||||||||||||||
Project Description
Teton was awarded the OSBL (Outside Battery Limits) Civil and the #4 Hydrotreater Revamp Work. The OSBL Civil Work included the installation of approximately 225 concrete foundations and drilled piers throughout the refinery. The #4 Hydrotreater Revamp Work consisted of the installation of structural steel, equipment, fabrication and installation of approximately 10,000 lineal feet of piping, and the installation of insulation, steam tracing, and fireproofing by utilizing subcontractors.
|
Contact
For similar projects contact:Owner |
| Site Design and Build by Impello Inc. | Copyright © 2005 PCL Constructors Inc. All rights reserved. |
| Our operations are carried out by a number of independent companies which operate in different construction markets and geographic areas. |