| 1 |
Search Results |
 |
2004 Strathcona Shutdown
Location: |
Edmonton, AB |
Description: |
Shutdown and mechanical maintenance work in Complexes A, S & C at the existing Imperial Oil, Strathcona Refinery facility. |
Built By: |
Melloy Industrial Services Inc. |
|
|
|
|
 |
EDD Tie-In Shutdown
Location: |
|
Description: |
Major Pre-shutdown Installation Followed by Final tie-in |
Built By: |
Melloy Industrial Services Inc. |
|
|
|
|
 |
Empress Straddle Plant Heat Exchanger
Location: |
Medicine Hat, AB |
Description: |
Heat Exchanger Removal and Replacement |
Built By: |
Melloy Industrial Services Inc. |
|
|
|
|
 |
Fleetway SVOL Debottlenecking
Location: |
Goldboro, NS |
Description: |
Two tower retrays |
Built By: |
Melloy Industrial Services Inc. |
Delivery Method: |
Traditional Bid [TB] |
|
|
 |
Jumping Pound Boiler B4-1
Location: |
Cochrane, AB |
Description: |
Boiler B4-1 Repair |
Built By: |
Melloy Industrial Services Inc. |
|
|
|
|
 |
Peace River Pulp Facility Evaporator
Location: |
Edmonton, AB |
Description: |
Evaporator Tube Bundle Removal and Replacement |
Built By: |
Melloy Industrial Services Inc. |
|
|
|
|
| |
| 1 |